S.No |
Paper Title |
Author's |
View/Download |
1. |
A Case Study of Effective Application of Innovative Management
Localization on RCC Dam Construction at Kafue Gorge Lower
Hydroelectric Project |
Yuanguang Liu, Haiting Yuan, Ya n Sh i and Xiaojun Zhang |
 |
2. |
An innovative approach for construction of large adit through
River Borne Material at Vishnugad Pipalkoti Hydro Electric
Project (444MW), Uttarakhand, India |
D.V. Singh, R.K. Vishnoi, Gajendra Singh, Ajay Kumar, N.K.Ojha
And P. Vishwa karma |
 |
3. |
Sensitive analysis for Assessment of Criticality of Abutment
Slopes Through Numerical Modelling - A Case Study Of Koteshwar
HEP , Uttarakhand, India |
R.K. Vishnoi, Gajendra Singh, K.C. Uniyal, Ajay Kumar And
Sandeep Rallan |
 |
4. |
Application of Rotec Belt Conveyor Equipment At Kafue Gorge
Lower Project |
Yuanguang Liu, Haitao yang, Kuihua Liu and Yan Shi |
 |
5. |
Challenges in execution of Concrete Face Rock-Fill Dams In
Emerging Economies |
S.C. Mittal, Imran Sayeed, U.V. Hegde and Senthil Raja |
 |
6. |
Construction Management System for Rock-Filled Concrete Dam |
Xiaorong Xu, Feng Jin and Hu Zhou |
 |
7. |
Design and Security Analysis of High Asphalt Concrete Core
Rock-fill Dam |
LIUSh ijia, DENG Yiguo, KONG Caifen, YANG Jian and LIU Haiyu |
 |
8. |
The Use of Hydrophilic Waterstops in Dams Construction |
S. Taubert, P. Bu chanan and S. Fox |
 |
9. |
Slope Stability of Hillock near Banda Branch Canal using GT S NX
Software - A Case Study |
Dr. Sanjay A. Burele and Shri K. A. M. Bagwan |
 |
10. |
Ranganadi Dam : A Success Story of Foolproof Planning and Speedy
Construction |
Rakesh Kumar Khali |
 |
11. |
Key Construction Technology of 300m High Core wall Rock-fill Dam |
Wu Gaojian, Fan Peng and Han Xing |
 |
12. |
Construction of the Kishanganga Hydroelectric Project Concrete
Faced Rock Fill Dam, India |
A. Agarwal, M. Palmer and Y. Dadheech |
 |
13. |
Construction of Borinquen Dam 1E at the Panama Canal |
Lelio
Mejia, James Toose and Jorge Fernandez |
 |
14. |
Successful Application of RCC Interlayer Joint Bonding
Technology with Surface Long Time Exposed In Dry and High
Temperature Areas |
Junjie Jin, Qingguo Zhou, Shuncai Ning and Yuanguang Liu |
 |
15. |
Sustainable Development in the Construction of Concrete Dams in
India |
Dr S C Maiti |
 |
16. |
The introduction effects of 3D information models in
Koishiwaragawa Dam Construction Project |
T. Miyazaki, T. Yoshida |
 |
17. |
Mid-course corrections in significant project parameters due to
extreme event of flash flood in Vishnugad Pipalkoti Hydro
Electric Project (444MW), Uttarakhand, India |
R.K. Vishnoi, Gajendra Singh, Ajay Kumar, N. K.Ojha and P.
Vishwakarma |
 |
18. |
Energy-based Real-time Monitoring and Intelligent Evaluation of
Fresh Concrete Vibration Quality |
Ce Bian |
 |
19 |
Thermal control measures to enable rapid concrete placement at
the Yusufeli Dam |
Quentin Shaw
|
 |